Panel Upgrade Service

    Professional electrical panel replacement and upgrade service. Our licensed electricians ensure code-compliant installation.

    $1,800 CADstarting price

    Book Your Panel Upgrade

    Fill out the form below and proceed to secure payment ($1,800 CAD starting price). All fields are required unless marked optional.

    Contact Information

    Service Details

    Panel Upgrade Service

    Secure payment via Stripe

    $1,800 CAD

    What's Included

    • Complete panel replacement and installation
    • Permit coordination and inspection support
    • Code-compliant installation by licensed electrician
    • Up to 40 circuit spaces
    • 1-year labor warranty

    Why Fort McMurray homes upgrade their electrical panel

    Most homes in Fort McMurray were built with 100 A or 125 A service — perfectly adequate when the only major loads were a furnace, range, dryer, and a few baseboard heaters. Today, the average household runs an electric range, a dryer, central HVAC with electric backup, an EV charger, a hot tub, kitchen renos with induction cooktops, basement suites, and high-wattage block heaters all on the same service. That's why panel upgrades — typically to 200 A — have become one of our most-requested jobs across Timberlea, Thickwood, Beacon Hill, and Parsons Creek.

    What's included in the upgrade

    A standard panel upgrade in Fort McMurray includes the new main breaker panel and labelled directory, a meter base swap if required by ATCO Electric, new service entrance conductors and grounding electrode system to current Canadian Electrical Code, all permits and inspections through the local Safety Codes Permit Service, and reconnection coordination with the utility. Most upgrades are completed in a single day with power off for 4–8 hours, scheduled at your convenience.

    After you submit this order

    Once we receive your order details, a Crescent Electric estimator reviews the site requirements, confirms scope and pricing with you by phone, pulls the electrical permit, and coordinates the ATCO disconnect/reconnect window. Most homeowners have their new panel installed within 7–14 business days of order confirmation. Questions before you submit? Call (587) 557-5494 or browse our full panel upgrade information page.

    Chat with us on WhatsApp
    Call NowText Mohammad